BIBLIOGRAPHY

Minimum Implementation Timetable

Document thumbnail
Data Info ព័ត៌មានទិន្នន័យ
Record ID :
លេខឯកសារ :
D24046
D24046
Title of Doc / Book :
Minimum Implementation Timetable
Language of Doc / Book :
ភាសាឯកសារ / សៀវភៅ :
Eng
ភាសាអង់គ្លេស
Country of Publication :
Kh
Location of Doc / Book :
KH, DC-CAM, Document no. D24046 KH, H
Collation :
2 pages
Data Info Note កំណត់ចំណាំព័ត៌មាន
Copy in Hand (Physical Qualities) :
tx
Source of Document :
ប្រភពឯកសារ :
David Hawk
ដេវីត ហក
Place Notes កំណត់ចំណាំកន្លែង
Date / Place of Finding (Location and Time Document Received) :
កាលបរិច្ឆេទ / ទីតាំងប្រមូលឯកសារ :
David Hawk 2000
ដាវីដ ហក ២០០០
Doc Notes
Summary / Abstract :
The following timetable is intended only as a guide to the minimum among of time required between the major steps in the implementation of a settlement. The starting point for the process may well be later than February, March, as indicated below, but the intervals between the steps should remain essentially the same.
Copyright :
© DC-Cam
រក្សាសិទ្ធិដោយ :
© មជ្ឈមណ្ឌលឯកសារកម្ពុជា